EN
Down Arrow
User Icon
Hamburger Icon
SEARCH
X

بحث موقع GAC

بحث

مشورة GAC

تقدم اللجنة الاستشارية الحكومية GAC المشورة الى مجلس إدارة ICANN حول قضايا السياسات التي قد تتداخل مع سياسات ICANN ومختلف القوانين والاتفاقيات الدولية وأهداف المصلحة العامة. ويتم تقديم مشورة اللجنة الاستشارية الحكومية GAC الى مجلس إدارة ICANN من خلال إما البيان الاختتامي للجنة او عبر المراسلات الرسمية.

2012-03-16-gTLD-2-EW

مشورة GAC

الرقم المرجعي:

2012-03-16-gTLD-2-EW

First Delivered via :

N/A

الإجماع:

تحقق الإجماع

2012-03-16-gTLD-2-EW

Communication

The GAC looks forward to receiving from ICANN the final decision on how it intends to handle batching should it be necessary once the application window closes. The GAC raised concerns that a set of criteria or a process for batching has not yet been decided on. With regard to the batching process and GAC Early Warning, the GAC appreciates the Board’s consideration that should batching be necessary Early Warnings could also occur in batches. However, with no formal process or criteria for batching, it is still unclear to the GAC how batching will affect the Early Warning process and its feasibility.

Though the applicant’s due diligence reports will not be available the GAC expects that if an applicant does not meet the criteria or the report is not satisfactory the application will not be allowed to proceed.

Communication

The GAC looks forward to receiving from ICANN the final decision on how it intends to handle batching should it be necessary once the application window closes. The GAC raised concerns that a set of criteria or a process for batching has not yet been decided on. With regard to the batching process and GAC Early Warning, the GAC appreciates the Board’s consideration that should batching be necessary Early Warnings could also occur in batches. However, with no formal process or criteria for batching, it is still unclear to the GAC how batching will affect the Early Warning process and its feasibility.

Though the applicant’s due diligence reports will not be available the GAC expects that if an applicant does not meet the criteria or the report is not satisfactory the application will not be allowed to proceed.